Skip to content

Constructors Journal

  • About
    • About Us
    • The Crew
    • Clients
    • Partners
  • Brochures
    • All Brochures
    • Featured Brochure
    • Previously Featured
  • Articles
  • Media
    • LinkedIn
    • Media Kit
  • Contact
  • Subscribe

$1.2B Sticker Shock: Why Corpus Christi Terminated Kiewit on a Water Project

A city council member who voted to cancel the design work criticized the design-build process. .

Author editorPosted on November 4, 2025Categories US Construction

Post navigation

Previous Previous post: $1.2B Sticker Shock: Why Corpus Christi Terminated Kiewit on a Water Project
Next Next post: $1.2B Sticker Shock: Why Corpus Christi Terminated Kiewit on a Water Project
  • About
    • About Us
    • The Crew
    • Clients
    • Partners
  • Brochures
    • All Brochures
    • Featured Brochure
    • Previously Featured
  • Articles
  • Media
    • LinkedIn
    • Media Kit
  • Contact
  • Subscribe
Constructors Journal Proudly powered by WordPress