Skip to content

Constructors Journal

  • About
    • About Us
    • The Crew
    • Clients
    • Partners
  • Brochures
    • All Brochures
    • Featured Brochure
    • Previously Featured
  • Articles
  • Media
    • LinkedIn
    • Media Kit
  • Contact
  • Subscribe

FY 2026 NDAA Codified, Locking In Progressive Design-Build and Multiyear Authority

The FY 2026 NDAA is now law, codifying progressive design-build and multiyear contracting that could reshape how defense agencies procure and deliver military construction projects. .

Author editorPosted on December 19, 2025Categories US Construction

Post navigation

Previous Previous post: FY 2026 NDAA Codified, Locking In Progressive Design-Build and Multiyear Authority
Next Next post: FY 2026 NDAA Codified, Locking In Progressive Design-Build and Multiyear Authority
  • About
    • About Us
    • The Crew
    • Clients
    • Partners
  • Brochures
    • All Brochures
    • Featured Brochure
    • Previously Featured
  • Articles
  • Media
    • LinkedIn
    • Media Kit
  • Contact
  • Subscribe
Constructors Journal Proudly powered by WordPress